Hi there,

today I switched to using copy jobs to create the tier 2 backup (instead of 
backup jobs from the original source). I realized that the copied job on tier 2 
storage has the exact same name as the job on tier from which it was copied.

I am now unclear how I can schedule verify jobs for the tier copies. Previously 
I used the name of the tier 2 back up to identify the job that should be 
verified. Now the tier 2 copy job has the same name as the tier 1 backup job. 
How do I discern them when scheduling (I could not use the job IDs as there are 
not known when the verify job is scheduled).

Any ideas how to achieve this?