Hi,

Oddly, jobs run sequentially as follows rather than duplicates being cancelled:

Running Jobs:
Console connected at 29-Mar-20 12:36
 JobId  Type Level     Files     Bytes  Name              Status
======================================================================
 70172  Back Diff        120    36.70 M Backup-pc is running
 70173  Back Incr          0         0  Backup--pc is waiting on max Job jobs
====

Are there any pointers to trace why the duplicate job 70173  is not cancelled?


The job is configured with:

  Allow Duplicate Jobs = no
  Cancel Queued Duplicates = yes
  Cancel Lower Level Duplicates = yes

The file daemon on the PC is default: Maximum Concurrent Jobs = 10

The storage daemon: Maximum Concurrent Jobs = 20

The client: Maximum Concurrent Jobs = 10

The director: Maximum Concurrent Jobs = 6


Versions:

Director: 7.4.4 (202Sep16)

PC: 7.4.4 (28Sep16) Microsoft Professional (build 9200), 
64-bit,Cross-compile,Win64

Director and storage server are same: running Debian old stable

PC: Windows 10


Huge thanks

Bernie



_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users

Reply via email to