since you are so kind and prepared,
I have another question:
All my strategy will be based on Incremental, so every weekly I will copy
the last incremental in the "DestinationPool", and every Month I have to
perform a VirtualFull..
If I understood well, in both case I have to set a 'Next Pool' into the "
OriginalPool", can I set different "Next Pool" for this 2 Jobs?
How can I do?
Thank you
2015-09-23 3:39 GMT+02:00 Ana Emília M. Arruda <emiliaarr...@gmail.com>:
> You're welcome :).
>
> I'm sorry I made a mistake with the directive for the volume retention
> period in the Pool definition. The bellow is correct:
>
> Pool {
> Name = OriginalPool
> Pool Type = Backup
> Volume Retention = 7 days
> ...
> Next Pool = DestinationPool
> }
>
> Pool {
> Name = DestinationPool
> Pool Type = Backup
> Volume Retention = 30 days
> }
>
> Best regards,
> Ana
>
> On Tue, Sep 22, 2015 at 6:38 PM, Carlo Filippetto <
> carlo.filippe...@gmail.com> wrote:
>
>> Thank you very mutch
>>
>> ^_^
>> Il 22/set/2015 18:50, "Ana Emília M. Arruda" <emiliaarr...@gmail.com> ha
>> scritto:
>>
>>> Hello Carlo,
>>>
>>> Yes. You can have a "Next Pool" directive configured for being used by
>>> your copy job. This way, you can configure the pool for 30 days retention:
>>>
>>> Job {
>>> Name = OriginalJob
>>> Type = Backup
>>> ...
>>> Pool = OriginalPool
>>> }
>>>
>>> Pool {
>>> Name = OriginalPool
>>> Pool Type = Backup
>>> Retention Period = 7 days
>>> ...
>>> Next Pool = DestinationPool
>>> }
>>>
>>> Pool {
>>> Name = DestinationPool
>>> Pool Type = Backup
>>> Retention Period = 30 days
>>> }
>>>
>>> Job {
>>> Name = CopyJob
>>> Type = Copy
>>> Pool = OriginalPool
>>> ...
>>> }
>>>
>>> Best regards,
>>> Ana
>>>
>>> On Tue, Sep 22, 2015 at 8:00 AM, Carlo Filippetto <
>>> carlo.filippe...@gmail.com> wrote:
>>>
>>>> Hi,
>>>> Noone have idea if the copy job can have a retention bigger that the
>>>> original volumes?
>>>> I have to modify it from "Update" command in bconsole?
>>>>
>>>> Thank you
>>>>
>>>>
>>>>
>>>> 2015-09-21 16:33 GMT+02:00 Carlo Filippetto <carlo.filippe...@gmail.com
>>>> >:
>>>>
>>>>> Hi all
>>>>>
>>>>> I would like to modify my backup strategy: it is possible to use Copy
>>>>> Job as Weekly Job?
>>>>>
>>>>> I'll explain:
>>>>> I need to make every day incremental, to move this volumes outside for
>>>>> restore in second site, but I can't use 30 Volumes, to cover all the
>>>>> month.
>>>>> Can I use 7 daily volumes and every Sunday make a Copy of the last Volumes
>>>>> (with retention 30days) and let them leave for a month?
>>>>>
>>>>> Thank you
>>>>>
>>>>>
>>>>>
>>>>
>>>>
>>>> ------------------------------------------------------------------------------
>>>>
>>>> _______________________________________________
>>>> Bacula-users mailing list
>>>> Bacula-users@lists.sourceforge.net
>>>> https://lists.sourceforge.net/lists/listinfo/bacula-users
>>>>
>>>>
>>>
>
------------------------------------------------------------------------------
Monitor Your Dynamic Infrastructure at Any Scale With Datadog!
Get real-time metrics from all of your servers, apps and tools
in one place.
SourceForge users - Click here to start your Free Trial of Datadog now!
http://pubads.g.doubleclick.net/gampad/clk?id=241902991&iu=/4140
_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users