These directives might also be useful to you:
Allow Duplicate Jobs = no
Cancel Lower Level Duplicates = yes
Cancel Queued Duplicates = yes
Bryn
On 2015-04-30 02:57 AM, Luc Van der Veken wrote:
So simple that I’m a bit embarrassed: a Maximum Concurrent Jobs
setting in the Job resource itself should prevent it.
I thought that setting was applicable to all kinds of resources except
for job resources themselves, should have checked the documentation
sooner.
*From:*Luc Van der Veken [mailto:luc...@wimionline.com]
*Sent:* 30 April 2015 9:09
*To:* bacula-users@lists.sourceforge.net
*Subject:* [Bacula-users] Same job started twice
Hi all,
Is it possible that, in version 5.2.5 (Ubuntu),
1)An incremental job is started according to schedule, before a
previous full run of the same job has finished?
2)A nasty side effect when that happens is that the incremental job is
bounced to full because “Prior failed job found in catalog. Upgrading
to Full.”, while there have been no errors?
I seem to be in that situation now.
The client has ‘maximum concurrent jobs’ set to 3, because the same
client is used for backing up different NFS-mounted shares as separate
jobs. Most of those are small, except for one, and that’s that one
that has the problem.
The normal schedule is either full or differential on Friday night,
incremental on Monday through Thursday, and nothing on Saturday or Sunday.
Because many full jobs are scheduled for Friday and only a limited
number run concurrently, it usually only really starts on Saturday
morning.
The first overrun of Full into the next scheduled run was caused not
by the job itself taking too long, but by a copy job that was copying
that job from disk to tape, and that had to wait for a new blank tape
for too long.
From there on I think it took longer than 24 hours to complete because
it ran two schedules of the same job concurrently each time.
At least that’s what the director and catalog report.
Fom Webacula:
Information from DB Catalog : List of Running Jobs
IdJob NameStatusLevelErrorsClientStart Time
yy-mm-dd
28822NAS-ElvisRunningF-NAS2015-04-29 11:29:48
28851NAS-ElvisRunningF-NAS2015-04-29 20:06:00
Both are incremental jobs upgraded to Full because of a ‘previous
error’ that never occurred.
I just canceled the later one to give the other time to finish before
it’s rescheduled again tonight at 20:06:00.
Besides that, there must be something else I have to find. I don’t
think it’s normal that a backup of 600 GB from an NFS share to disk on
another NFS share takes more than 20 hours, as the last ‘normal’ run
last Saturday did (the physical machine the job is on is the SD
itself, backing up an NFS share to another NFS share).
------------------------------------------------------------------------------
One dashboard for servers and applications across Physical-Virtual-Cloud
Widest out-of-the-box monitoring support with 50+ applications
Performance metrics, stats and reports that give you Actionable Insights
Deep dive visibility with transaction tracing using APM Insight.
http://ad.doubleclick.net/ddm/clk/290420510;117567292;y
_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users
------------------------------------------------------------------------------
One dashboard for servers and applications across Physical-Virtual-Cloud
Widest out-of-the-box monitoring support with 50+ applications
Performance metrics, stats and reports that give you Actionable Insights
Deep dive visibility with transaction tracing using APM Insight.
http://ad.doubleclick.net/ddm/clk/290420510;117567292;y
_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users