ok.  First, thanks for cc'ing the list :-)

Next, regarding the priority of pools and other things specified, so is 
the following statement correct?:

Item specified in referenced items will override earlier items. For 
example, if a pool is specified in a Job, and then specified in a 
JobDefs line, the pool in the referenced jobdef will override the pool 
in the job.  Similiarly, if a schedule is then referenced AFTER the 
fileset is referenced, a pool in the schedule will override the pool(s) 
in the fileset, jobdefs and original job.

Thanks.

JBB

On 5/29/2013 11:14 AM, Bill Arlofski wrote:
> On 05/29/13 08:12, Jonathan Bayer wrote:
>> A question.
>>
>> If the pool is specified both in the schedule and the job resource, which
>> takes priority if they are different?
>>
>> Thanks
>>
>> JBB
> The Pool specified in the Schedule resource will override the Pool in the Job
> or JobDef resource.
>
> FYI: I CC:ed the list to keep the conversation on the list.
>


------------------------------------------------------------------------------
Introducing AppDynamics Lite, a free troubleshooting tool for Java/.NET
Get 100% visibility into your production application - at no cost.
Code-level diagnostics for performance bottlenecks with <2% overhead
Download for free and get started troubleshooting in minutes.
http://p.sf.net/sfu/appdyn_d2d_ap1
_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users

Reply via email to