Hello List,

When I start a Copy type job, two jobs are actually started. E.g when I want
to copy a job originally called 'client1-full' within a Copy job called
'client1-copy', the database holds two running job records, one of them
called 'client1-copy', with the Type field set to 'C' (Copy), and the
other called 'client1-full', level F, Type B (Backup). Is there a way to
find out if this second one is started because of the Copy job, or it is
meant to be run e.g because of a schedule or a console action?

Thanks in advance!

Best regards,
Gergely Polonkai
--
"You need to believe in things that aren't true. How else can they become?"
- Terry Pratchett
------------------------------------------------------------------------------
Xperia(TM) PLAY
It's a major breakthrough. An authentic gaming
smartphone on the nation's most reliable network.
And it wants your games.
http://p.sf.net/sfu/verizon-sfdev
_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users

Reply via email to