Hello,

Recently we went through a following scenario:

An external USB drive to which JobA was supposed to write became unusable. JobA 
requested a mount. Jobs B through Z that were scheduled to run after JobA did 
not run. As a result we lost two days of backups.

How can we make sure that jobs whose destination drives are accessible do not 
get blocked by jobs whose destination drives are inaccessible?

Thanks,
Greg Golin

Attachment: smime.p7s
Description: S/MIME cryptographic signature

------------------------------------------------------------------------------
This SF.net Dev2Dev email is sponsored by:

Show off your parallel programming skills.
Enter the Intel(R) Threading Challenge 2010.
http://p.sf.net/sfu/intel-thread-sfd
_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users

Reply via email to