Hello, Recently we went through a following scenario:
An external USB drive to which JobA was supposed to write became unusable. JobA requested a mount. Jobs B through Z that were scheduled to run after JobA did not run. As a result we lost two days of backups. How can we make sure that jobs whose destination drives are accessible do not get blocked by jobs whose destination drives are inaccessible? Thanks, Greg Golin
smime.p7s
Description: S/MIME cryptographic signature
------------------------------------------------------------------------------ This SF.net Dev2Dev email is sponsored by: Show off your parallel programming skills. Enter the Intel(R) Threading Challenge 2010. http://p.sf.net/sfu/intel-thread-sfd
_______________________________________________ Bacula-users mailing list Bacula-users@lists.sourceforge.net https://lists.sourceforge.net/lists/listinfo/bacula-users