Hi all,

my job configuration specifies Max Wait Time = 6 hours. The job was
scheduled manually at 9:00 to run via When at time 20:00. The job was
then cancelled due to "Max Wait Time exceeded" at 15:00. I would expect
that "Max Wait Time" is overridden if the job is ran with specified
"When" directive. Is there a way to change this? bconsole seem not to
have a cmd/option for this. I also didn't find a hint in the docs about it.


Regards,

Dimitri Puzin aka Tristan-777

Attachment: signature.asc
Description: OpenPGP digital signature

------------------------------------------------------------------------------
Apps built with the Adobe(R) Flex(R) framework and Flex Builder(TM) are
powering Web 2.0 with engaging, cross-platform capabilities. Quickly and
easily build your RIAs with Flex Builder, the Eclipse(TM)based development
software that enables intelligent coding and step-through debugging.
Download the free 60 day trial. http://p.sf.net/sfu/www-adobe-com
_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users

Reply via email to