Hi all, my job configuration specifies Max Wait Time = 6 hours. The job was scheduled manually at 9:00 to run via When at time 20:00. The job was then cancelled due to "Max Wait Time exceeded" at 15:00. I would expect that "Max Wait Time" is overridden if the job is ran with specified "When" directive. Is there a way to change this? bconsole seem not to have a cmd/option for this. I also didn't find a hint in the docs about it.
Regards, Dimitri Puzin aka Tristan-777
signature.asc
Description: OpenPGP digital signature
------------------------------------------------------------------------------ Apps built with the Adobe(R) Flex(R) framework and Flex Builder(TM) are powering Web 2.0 with engaging, cross-platform capabilities. Quickly and easily build your RIAs with Flex Builder, the Eclipse(TM)based development software that enables intelligent coding and step-through debugging. Download the free 60 day trial. http://p.sf.net/sfu/www-adobe-com
_______________________________________________ Bacula-users mailing list Bacula-users@lists.sourceforge.net https://lists.sourceforge.net/lists/listinfo/bacula-users