-----BEGIN PGP SIGNED MESSAGE-----
Hash: SHA1

Hello,

sometimes i had the situation where the job is waiting is waiting for a
volume on storage FOO, but I have a new/recycled or empty volume in
storage BAR. How can i achive this on a currently running/waiting job?

How can i handle this in the job? Actually i tired to define two
storages witin JobDefs like this:

Storage = BAR
Storage = FOO

But it seems not fo fit my requirements.

Thanks and best regards

Stefan Pampel
-----BEGIN PGP SIGNATURE-----
Version: GnuPG v1.4.9 (GNU/Linux)

iEYEARECAAYFAkkxa2UACgkQXXT1nfS2Z+F9mgCeIxethXjVPyDbg+n3IlzN5l+C
5ewAoKyd8vgqZleOfa985Wocbb4tgWtu
=tXvm
-----END PGP SIGNATURE-----

-- 
/ polyformal                /
| http://www.polyformal.de /
|_________________________/
GPG KEY: 11678845


-------------------------------------------------------------------------
This SF.Net email is sponsored by the Moblin Your Move Developer's challenge
Build the coolest Linux based applications with Moblin SDK & win great prizes
Grand prize is a trip for two to an Open Source event anywhere in the world
http://moblin-contest.org/redirect.php?banner_id=100&url=/
_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users

Reply via email to