Hi. I'm runnning 2 concurrent jobs, and that works without any problems (after getting the 2 LTO3 drives on their own controller).
Is it "by design" og a misconfiguraion that the two concurrent jobs hit the spooldata size at the same time? It would be nice if the Spool-limit was pr. job or something. Now, even I've got spooling, I'll actually put the 2 jobs to the same tape at the same time (this is a situation where the jobs go to the same pool) 12-Feb 09:49 bacula-sd JobId 13174: User specified spool size reached. 12-Feb 09:49 bacula-sd JobId 13181: User specified spool size reached. 12-Feb 09:49 bacula-sd JobId 13181: Writing spooled data to Volume. Despooling 18,198,928,610 bytes ... 12-Feb 09:49 bacula-sd JobId 13174: Writing spooled data to Volume. Despooling 281,801,145,301 bytes ... Thanks. -- Jesper Krogh ------------------------------------------------------------------------- This SF.net email is sponsored by: Microsoft Defy all challenges. Microsoft(R) Visual Studio 2008. http://clk.atdmt.com/MRT/go/vse0120000070mrt/direct/01/ _______________________________________________ Bacula-users mailing list Bacula-users@lists.sourceforge.net https://lists.sourceforge.net/lists/listinfo/bacula-users