Hi.

I'm runnning 2 concurrent jobs, and that works without any problems (after
getting the 2 LTO3 drives on their own controller).

Is it "by design" og a misconfiguraion that the two concurrent jobs hit
the spooldata size at the same time? It would be nice if the Spool-limit
was pr. job or something. Now, even I've got spooling, I'll actually put
the 2 jobs to the same tape at the same time (this is a situation where
the jobs go to the same pool)

12-Feb 09:49 bacula-sd JobId 13174: User specified spool size reached.
12-Feb 09:49 bacula-sd JobId 13181: User specified spool size reached.
12-Feb 09:49 bacula-sd JobId 13181: Writing spooled data to Volume.
Despooling 18,198,928,610 bytes ...
12-Feb 09:49 bacula-sd JobId 13174: Writing spooled data to Volume.
Despooling 281,801,145,301 bytes ...

Thanks.

-- 
Jesper Krogh


-------------------------------------------------------------------------
This SF.net email is sponsored by: Microsoft
Defy all challenges. Microsoft(R) Visual Studio 2008.
http://clk.atdmt.com/MRT/go/vse0120000070mrt/direct/01/
_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users

Reply via email to