Hi all
Does the "Maximum Volume Jobs" parameter on the pools mean that they
will be marked as full after one *JOB*. Is it possible to mark a volume
as full after one set of scheduled jobs?
Say, for example I have a full backup running over Friday night, and
they take up 1.5 tapes. Is it possible to mark both these tapes as
"Full", so the next full backup will start on the third tape, rather
than appending to the end of the data on tape #2?
The way I read it is that if I set Maximum Volume Jobs on a pool, each
tape in that pool will only have one client/job on it before its marked
as full.
Steve
-------------------------------------------------------
This SF.net email is sponsored by: Splunk Inc. Do you grep through log files
for problems? Stop! Download the new AJAX search engine that makes
searching your log files as easy as surfing the web. DOWNLOAD SPLUNK!
http://sel.as-us.falkag.net/sel?cmd=lnk&kid=103432&bid=230486&dat=121642
_______________________________________________
Bacula-users mailing list
Bacula-users@lists.sourceforge.net
https://lists.sourceforge.net/lists/listinfo/bacula-users