Hi!
The manual says that the Pool directive "Volume Use Duration" is only checked at the end of a job that writes to a volume.
Is there a way to manually trigger this check? (E.g. to mark all "Appendable" daily volumes as Used when doing a full backup?)
I could set the Volume Use Duration so that it will fire at the end of the last differential backup before a weekly full backup but the problem is that the last scheduled differential backup runs two days before the next full backup, because there are no scheduled jobs during the weekend. So I'd have to set the "Volume Use Duration" to 4 days. The problem with this setup is that I'd like to allow manual (differential) backups to this volume during the weekend, so I'd like to mark the volume as Used just before the Full backup is started.
Is there a way to configure this behavior?
Thanks in advance, --leo -- ----------------------------------------------------------------------- [EMAIL PROTECTED] Fax: +43-1-31336-906050 Zentrum fuer Informatikdienste - Wirtschaftsuniversitaet Wien - Austria
------------------------------------------------------- SF email is sponsored by - The IT Product Guide Read honest & candid reviews on hundreds of IT Products from real users. Discover which products truly live up to the hype. Start reading now. http://ads.osdn.com/?ad_id=6595&alloc_id=14396&op=click _______________________________________________ Bacula-users mailing list Bacula-users@lists.sourceforge.net https://lists.sourceforge.net/lists/listinfo/bacula-users