Hi Petrit,

Tks for the quick response!

Responding in-line below.


El 20/7/20 20:07, "Petrit Hasani" <[email protected]> escribió:

    Hi Jordi,

    Thank you for your feedback. I will try to address each point, please do 
let me know if I miss something.

    I would like to start with your last comment about implementation in other 
RIRs, which may help clarify some of your other concerns as well.
    The Impact Analysis is based on the current RIPE NCC policies and 
procedures. The RIPE NCC will manually follow up with the members to try and 
fix the incorrect details (not validated). This manual follow up generates the 
mentioned workload. This manual follow up may not be happening in other regions 
which allows for a more automated approach.

[Jordi] I guess I miss-explained my point on this. The other RIR that already 
implemented a more complex policy that this proposal is APNIC. What I'm saying 
is that it may be some correlation between their figures of % of how much 
manual work they need to do if the validation is failing, because I think the 
figures that you have extrapolated from the actual validation, are really 
overestimated. I fully understand that it will be anyway and estimation, 
because regional differences, but I really think that reading the IA with those 
numbers, and making very clear that is an estimation, can provide a very 
wrong/biased view.

    1) The current validation process expresses the RIPE NCCs understanding of 
policy proposal 2017-02. Our understanding was shared in the Impact Analysis at 
the time (the validation process was included as well) and the policy was 
approved based on that understanding. Our view is that the purpose of RIPE-705 
is being fulfilled under the current validation process.

[Jordi] Yes, I understand that, but doesn't preclude that I still think, even 
if I'm not native English speaker, that is not a correct interpretation of 
literal English text. "required and intended" say all. If you require something 
to intend to be able to send abuse reports, and the intent is not fulfilled 
because the mailbox doesn't work ...

    However, we are not claiming in this impact analysis that the out of 92.5% 
of the email addresses currently validated automatically, there does not exist 
the possibility that a certain % does not reach the intended party due to email 
address belonging to somebody else, an unchecked or a full mailbox, etc. This 
is the reason we stated on our Impact:

    "If this proposed policy change reaches consensus, an improvement of the 
registry data is expected as more “abuse-mailbox:” attributes will be current 
and correct."

[Jordi] We agree here, no doubt. I just wanted to stress the point that many 
folks in the community may still believe that we have over 92.5% correct abuse 
mailboxes, which is not the case (I said unless, but I understand its very 
difficult to have that data, unless we do a different validation ...).

    2) We have had only one full year validation (2019) so we can not provide 
accurate comparison before the end of 2020 on how has the situation has changed.

[Jordi] I don't recall right now how has been done that during the 2019, or 
even a bit before (if it started before), but my point was to have the numbers 
across the different months or quarters. So, if you did, for example, 25% of 
the validations each quarter, we could see differences with the 1st and 2nd 
quarter in 2020. I'm assuming that because that validation was yearly, the 
validated data from 1Q2019 has been repeated in 1Q2020, and so son. We could 
even see if the people that was manually called on for correcting invalid data 
is now not being called again in a given %. This will tell us that the amount 
of workload usually will be reduced.

    3+4) All current “abuse-mailbox:” attributes will be validated in batches.

[Jordi] This may be good enough, if you can adjust the "pause" in between 
batches to allow manual verifications and the size of the batches. An 
alternative is to have, as part of the automation, a distribution based on the 
week or month of the original contract for each LIR, etc. Many ways to optimize 
it, so the workload is evenly distributed as much as possible.

    5+6) I would like to clarify that “10 times the current level” refers to 
workload, not FTEs. We have not made a calculation on the exact number of FTEs 
needed. We only state that a significant number is expected due to the workload 
level.

[Jordi] Wow, that can bring to a very different interpretation and result ...

    We tried to explain in the Impact Analysis how we came up with the number 
~32,000 tickets per validation round and estimated the number of tickets that 
would require a manual follow up (around 30% according to 2019’s figures). The 
number of ticket which need a manual follow up could improve over the years. 
However at this time the RIPE NCC can not reliably estimate it.

[Jordi] But then what you're missing is that the proposal gives the RIPE NCC 
the freedom to, in case of a huge number of manual validations are needed, 
instead of doing the 1st validation in 6 months, you may need 12 months, or 
even 18. Not an issue. No need to have more FTEs for that, if the board or 
whoever is in charge of taking the decision don't want to hire more staff (that 
was my goal on that part of the proposal -> you manage it at your own pace).

One more advantage of this manual validations is that it may help to discover 
LIRs, resources, etc., which even if they "pay the bills" automatically, are 
not really taking care of the resources ... People in charge let the company, 
that department doesn't exist (but admin pay all the yearly bills, this 
happens, I've seen it), etc. This was not my goal with the proposal, but I 
think it adds some additional value, I just realized it.

    I hope the explanation above is helpful. Please let us know if you have any 
other concerns.

[Jordi] Yes, thanks a lot, specially the FTE point.

    --
    Petrit Hasani
    Policy Officer
    RIPE NCC





    > On 20 Jul 2020, at 16:36, JORDI PALET MARTINEZ via anti-abuse-wg 
<[email protected]> wrote:
    > 
    > Hi Petrit,
    > 
    > Tks for the impact analysis!
    > 
    > However, I think there are some aspects not well covered.
    > 
    > 1) It is clear, unless you can provide stats about that, that we don't 
really know if the 92.5% of the automated validations check are *really* 
correct in the sense of being able to receive emails (due to mistakes, or on 
purpose), as some % may be reaching a null in-box, a mailbox that bounces 
because is full, a mailbox that bounces because is misconfigured, etc. As a 
consequence of that, the current validation is not really fulfilling the actual 
purpose of the RIPE-705, because "it is required to contain ... which is 
intended for receiving ...". If emails can't be received at least a % of the 
92.5% is not being validated.
    > 
    > 2) Maybe I got it wrong, but I think it is important to see the progress 
of tickets that where needed to open in different passes of RIPE-705. It is 
expected that in each pass you have less and less failing abuse-c mailboxes, 
right? Otherwise, it will be an indication that some LIRs aren't really doing 
the job to comply with RIPE-705.
    > 
    > 3) Just to make it clear: Changing the validation period is let 
on-purpose, as an operational aspect to the RIPE NCC. I think it is a feature, 
not an issue. This also allows a slow-start, as RIPE NCC did with the 
implementation of RIPE-705, so it allows to avoid the extra overload indicated 
in the IA. May be a full year or even 1.5-2 years are needed in the first pass. 
Not an issue, you can accommodate the internal process to the available man 
power for manual follow up.
    > 
    > 4) The proposal doesn't specify that you need to run all the validations 
on the same day. I expect the system to be smart, and for example consider an 
even split of validations per day, which you can tune, depending on what 
happened every previous week, so not to overload the resources needed for 
manual follow up. This is also in line which 3 above, and I understand is also 
the way RIPE-705 was implemented (at least initially).
    > 
    > 5) I really feel that expecting that 32.000 tickets for each round will 
be created is very exaggerated. If that's the case, that will probe my point 1 
above and indicate that we have a real problem. Even if that's the case, a 
smart slow-start process will not require 10 times the actual FTEs vs the 
current level. Again, it is important to insist that it should be done smartly 
and, in that sense,  it is a huge mistake, in my opinion, not considering it in 
the IA, because it provides a very biased view.
    > 
    > 6) Even if it is the case that in the first round we have 32.000 tickets, 
this is temporary, because following years will not be the same, otherwise, we 
have a different kind of problem with policy compliance.
    > 
    > One possible indication of if this really creates so much trouble, even 
if all the validations are sent on the same "day", will be to ask to APNIC, 
which already implemented a much stricter proposal a year ago, if I recall 
correctly. I understand that it is just an indication, different culture, NIR 
there/no here, etc., etc. LACNIC is on their way as well, but I don't know when 
it will be implemented yet.
    > 
    > Regards,
    > Jordi
    > @jordipalet
    > 
    > 
    > 
    > El 20/7/20 15:08, "anti-abuse-wg en nombre de Petrit Hasani" 
<[email protected] en nombre de [email protected]> escribió:
    > 
    >    Dear colleagues,
    > 
    >    Policy proposal 2019-04, "Validation of "abuse-mailbox"", is now in 
the Review Phase.
    > 
    >    This proposal aims to have the RIPE NCC validate "abuse-c:” 
information more often and introduces a new validation process.
    > 
    >    The RIPE NCC has prepared an impact analysis to support the 
community’s discussion.
    > 
    >    You can find the proposal and impact analysis at:
    >    https://www.ripe.net/participate/policies/proposals/2019-04
    >    
https://www.ripe.net/participate/policies/proposals/2019-04#impact-analysis
    > 
    >    And the draft documents at:
    >    https://www.ripe.net/participate/policies/proposals/2019-04/draft
    > 
    >    As per the RIPE Policy Development Process (PDP), the purpose of this 
four week Review Phase is to continue discussion of the proposal, taking the 
impact analysis into consideration, and to review the full draft RIPE Policy 
Document.
    > 
    >    At the end of the Review Phase, the working group chairs will 
determine whether the WG has reached rough consensus. It is therefore important 
to provide your opinion, even if it is simply a restatement of your input from 
the previous phase.
    > 
    >    We encourage you to read the proposal, impact analysis and draft 
document and send any comments to <[email protected]> before 18 August 
2020.
    > 
    >    Kind regards,
    > 
    >    --
    >    Petrit Hasani
    >    Policy Officer
    >    RIPE NCC
    > 
    > 
    > 
    > 
    > 
    > 
    > 
    > 
    > **********************************************
    > IPv4 is over
    > Are you ready for the new Internet ?
    > http://www.theipv6company.com
    > The IPv6 Company
    > 
    > This electronic message contains information which may be privileged or 
confidential. The information is intended to be for the exclusive use of the 
individual(s) named above and further non-explicilty authorized disclosure, 
copying, distribution or use of the contents of this information, even if 
partially, including attached files, is strictly prohibited and will be 
considered a criminal offense. If you are not the intended recipient be aware 
that any disclosure, copying, distribution or use of the contents of this 
information, even if partially, including attached files, is strictly 
prohibited, will be considered a criminal offense, so you must reply to the 
original sender to inform about this communication and delete it.
    > 
    > 
    > 
    > 
    > 




**********************************************
IPv4 is over
Are you ready for the new Internet ?
http://www.theipv6company.com
The IPv6 Company

This electronic message contains information which may be privileged or 
confidential. The information is intended to be for the exclusive use of the 
individual(s) named above and further non-explicilty authorized disclosure, 
copying, distribution or use of the contents of this information, even if 
partially, including attached files, is strictly prohibited and will be 
considered a criminal offense. If you are not the intended recipient be aware 
that any disclosure, copying, distribution or use of the contents of this 
information, even if partially, including attached files, is strictly 
prohibited, will be considered a criminal offense, so you must reply to the 
original sender to inform about this communication and delete it.





Reply via email to