On 01/08/2010 05:32 PM, Ed Murphy wrote:
Still covered by EXCUSED, though it's arguable whether the contestmaster CAN and/or SHALL finish the job in a later week.
I agree wrt the NOT GUILTY by means of impossibility. The FRC's text requires things be done as soon as possible after the end of each week; Agora's precedent and tradition is that when an obligation is not discharged within its time limit, an open-ended obligation is created that means that the action is still REQUIRED and also POSSIBLE if the requirement includes possibility.
-coppro