On Wed, 2008-11-05 at 23:10 +0000, Alex Smith wrote:
> On Tue, 2008-11-04 at 12:06 -0800, Charles Reiss wrote:
> > I submit the following Sell Ticket:
> > Cost: AUCTION
> > Action: In a timely fashion after waters rights are enforced in
> > December, transfer min(400, floor(Z * 1.5)) coins to the filler of
> > this ticket.
> > 
> > Define Q as the sum of the exchange rates of all pitches of note
> > credit with the PBA on 2008 December 1st 00:00:00 UTC.
> > 
> I bid 90 Coins.

To be clear, this is with the definition of Z which was above the
ticket, not the definition of Q below.
-- 
ais523

Reply via email to