Set the ballast on the unistrut going out?

This should work. It's only 2 months probabably

On Fri, Mar 20, 2020, 9:02 AM Jaime Solorza <losguyswirel...@gmail.com>
wrote:

> Rough sketch..
>
> On Thu, Mar 19, 2020, 1:28 PM Steve Jones <thatoneguyst...@gmail.com>
> wrote:
>
>> Working on a possible project and limiting to inventory on hand. We may
>> want to put some EPMP clusters on a piece of 25g on some roofs. 2 of the
>> roofs may be problematic as they are steel commercial roof with a pitch and
>> steel ridgecap.
>>
>> We have a pile of 25g sections on hand and a handful of baseplates. on
>> the flat roofs I could probably just frame out a ballast tray from angle
>> iron and fasten the baseplate right to that couldnt I? 10 foot freestanding
>>
>> A peak sled could be fashioned over the steel roofs, maybe, but
>> historically we tend to just stay off steel altogether, especially if
>> its pitched.
>>
>> Aside from chuck, who can make everything. out of normal onhand items
>> most of us have in the dead junk rooms, how would you get 10' sticks of 25g
>> to stay put with that kind of wind load? We have been deploying 3k sectors
>> with the smart antennas, but i think in this projects case i would
>> forego them to limit windload.
>>
>> Most of these roofs are relatively short, 20-40'
>> --
>> AF mailing list
>> AF@af.afmug.com
>> http://af.afmug.com/mailman/listinfo/af_af.afmug.com
>>
> --
> AF mailing list
> AF@af.afmug.com
> http://af.afmug.com/mailman/listinfo/af_af.afmug.com
>
-- 
AF mailing list
AF@af.afmug.com
http://af.afmug.com/mailman/listinfo/af_af.afmug.com

Reply via email to