Set the ballast on the unistrut going out? This should work. It's only 2 months probabably
On Fri, Mar 20, 2020, 9:02 AM Jaime Solorza <losguyswirel...@gmail.com> wrote: > Rough sketch.. > > On Thu, Mar 19, 2020, 1:28 PM Steve Jones <thatoneguyst...@gmail.com> > wrote: > >> Working on a possible project and limiting to inventory on hand. We may >> want to put some EPMP clusters on a piece of 25g on some roofs. 2 of the >> roofs may be problematic as they are steel commercial roof with a pitch and >> steel ridgecap. >> >> We have a pile of 25g sections on hand and a handful of baseplates. on >> the flat roofs I could probably just frame out a ballast tray from angle >> iron and fasten the baseplate right to that couldnt I? 10 foot freestanding >> >> A peak sled could be fashioned over the steel roofs, maybe, but >> historically we tend to just stay off steel altogether, especially if >> its pitched. >> >> Aside from chuck, who can make everything. out of normal onhand items >> most of us have in the dead junk rooms, how would you get 10' sticks of 25g >> to stay put with that kind of wind load? We have been deploying 3k sectors >> with the smart antennas, but i think in this projects case i would >> forego them to limit windload. >> >> Most of these roofs are relatively short, 20-40' >> -- >> AF mailing list >> AF@af.afmug.com >> http://af.afmug.com/mailman/listinfo/af_af.afmug.com >> > -- > AF mailing list > AF@af.afmug.com > http://af.afmug.com/mailman/listinfo/af_af.afmug.com >
-- AF mailing list AF@af.afmug.com http://af.afmug.com/mailman/listinfo/af_af.afmug.com