Wanda,
We do this now, along with running multiple concurrent SG backups.
Contact me offline and I'll send you a copy of our current Powershell script.

Steve Schaub
Systems Engineer II, Windows Backup/Recovery
BlueCross BlueShield of Tennessee
steve_schaub AT bcbst.com
423-535-6574 (desk)

-----Original Message-----
From: ADSM: Dist Stor Manager [mailto:ADSM-L@VM.MARIST.EDU] On Behalf Of 
Prather, Wanda
Sent: Monday, May 14, 2012 9:53 PM
To: ADSM-L@VM.MARIST.EDU
Subject: [ADSM-L] Mega-Exchange backup

I have a customer with a 1.2 TB Exchange 2007 DB, expected to grow to 3 TB in 
the next 4 months.
Fulls are already a problem (14 hours).
Is there any Exchange-related reason I can't do the fulls for a couple of 
storage groups on Monday, the next 2 on Tuesday, next 2 on Weds. etc and spread 
them out?

Thanks ..
-----------------------------------------------------
Please see the following link for the BlueCross BlueShield of Tennessee E-mail 
disclaimer:  http://www.bcbst.com/email_disclaimer.shtm

Reply via email to