Wanda, We do this now, along with running multiple concurrent SG backups. Contact me offline and I'll send you a copy of our current Powershell script.
Steve Schaub Systems Engineer II, Windows Backup/Recovery BlueCross BlueShield of Tennessee steve_schaub AT bcbst.com 423-535-6574 (desk) -----Original Message----- From: ADSM: Dist Stor Manager [mailto:ADSM-L@VM.MARIST.EDU] On Behalf Of Prather, Wanda Sent: Monday, May 14, 2012 9:53 PM To: ADSM-L@VM.MARIST.EDU Subject: [ADSM-L] Mega-Exchange backup I have a customer with a 1.2 TB Exchange 2007 DB, expected to grow to 3 TB in the next 4 months. Fulls are already a problem (14 hours). Is there any Exchange-related reason I can't do the fulls for a couple of storage groups on Monday, the next 2 on Tuesday, next 2 on Weds. etc and spread them out? Thanks .. ----------------------------------------------------- Please see the following link for the BlueCross BlueShield of Tennessee E-mail disclaimer: http://www.bcbst.com/email_disclaimer.shtm