I've never done this before and I don't think I've seen it discussed so I'll throw this out there. I was wondering if there are any ramifications when switching nodes to a new backup schedule. Meaning is there a chance that the nodes will be missed? I ask this because I have seen nodes added to a schedule after the scheduler was started and they ended up missed. Can this same thing happen when moving nodes between schedules or to a new schedule?
Thanks, Geoff Gill TSM Administrator PeopleSoft Sr. Systems Administrator SAIC M/S-G1b (858)826-4062 Email: [EMAIL PROTECTED]