I've never done this before and I don't think I've seen it discussed so
I'll throw this out there. I was wondering if there are any
ramifications when switching nodes to a new backup schedule. Meaning is
there a chance that the nodes will be missed? I ask this because I have
seen nodes added to a schedule after the scheduler was started and they
ended up missed. Can this same thing happen when moving nodes between
schedules or to a new schedule?

 

Thanks,

 

 