Hello, I am facing a dead backup with msgno ANR0487W...
----------- ANR0487W Session session number for node node name (client platform) terminated - preempted by another operation. Explanation: The server ends a client session in response to a cancel request issued by a higher priority operation that needed the mount point that the client was using. System Action: The server rolls back any transactions in progress for the terminated client session. User Response: Reissue the operation. If this message appears frequently, consider increasing the mountlimit value for the affected device class. ----------- I was running a DP for ERP backup and it stop (cleanly...) but in tsm log I can see ANR0487W. I am running TSM5.3.4.2 and DP for ERP 5.3.3. with API 5.3.3, which are not oldies isn't it ? In my case, it was just a problem of drives saturation and I restart the backup, loosing 24h of backup activity for this node. It is obvious that a so old problem is still managed by TSM in the same way. Is it a good solution for TSM to simply kill runnings backups rather than delay it ? As often, we are securing high cost data's and lossing 24h of protection can have a cost too... Regards, Pierre CayƩ