I'm trying to remember what it is about a backup schedule that, even though scheduled for say 8PM, does not kick off right away, nodes show pending for some time. I've been comparing the 5.2 and 5.3 server settings but can't find any obvious differences, yet the 5.2 server kicks off each schedule right at the specific time whereas the 5.3 server I'm putting up does not.
I have a clopt set that has schedmode as prompted, which is the same on both servers and scheduling modes is set to any, same on both servers. What am I missing that I thought I'd taken care of? I'd actually prefer to have these guys start right away. Thanks, Geoff Gill TSM Administrator PeopleSoft Sr. Systems Administrator SAIC M/S-G1b (858)826-4062 Email: <mailto:[EMAIL PROTECTED]> [EMAIL PROTECTED]
