Hello all,
I'm looking for a solution to 'fully' automate Oracle backups with TDP for Oracle in an Oracle Real Application Cluster. The operating system (Suse Linux) is not clustered. TDPO has been installed on both cluster nodes. Currently all Oracle (incr0, 1,2 and archive logs) backups are being scheduled to one on the two nodes. Now I'm looking for a solution how to handle Oracle failover situations from the point of backup view. This means as well the loss of a complete cluster node as one of the Oracle systems on the 'primary' backup cluster node. At least backing up the Oracle archive logs has to go on oh the other cluster node then. Has somebody of YOU hints and tips or maybe a solution how to handle failover situations here?. Any suggestion is very welcome. Thank you, Rainer