do you have enough scrach tape assigned to the tape pool? -----Original Message----- From: John C Dury [mailto:[EMAIL PROTECTED] Sent: Tue 4/1/2003 10:28 AM To: [EMAIL PROTECTED] Cc: Subject: problem with backup stgpool and maxprocess=2
I am trying to speed up the time required to backup our primary tape stgpool to our secondary site by changing the number of process allowed. When I changed MAXPROCESS=2, it kicked off 2 "Backup Storage Pool" processes which is what I expected but on the secondary system, the 2 sessions are both asking for the same volume to be mounted so only one is actually writing data and the other is just waiting for the tape from the active process. Obviously this isn't going to help get the data from my production system to my backup system any faster. I thought that the secondary system would have monuted 2 separate scratches and put them both in the same virtual volume and filled them both individually. Collocation is turned off. Any idea what is causing this and how I can fix it? Thanks, John