Sam, Even though the ptf coverletter says to do an upgradedb, it isn't necessary coming from 4.2.2.*. I called in a pmr on this and level 2 confirmed it.
So, what you are seeing is your server in normal operation. Bill At 04:54 PM 12/5/2002, you wrote: >I have just installed the 4.2.3 server upgrade and have been running the >UPGRADEDB process for almost 3 hours now. Has anyone else experienced >this and, if so, how long will this take. In the past, it has only run >a couple of minutes. > >This is an upgrade from 4.2.2 on OS/390 R10. DB is about 11GB 85% used. > >Thanks >Sam Sheppard >San Diego Data Processing Corp. >(858)-581-9668 ---------- Bill Colwell C. S. Draper Lab Cambridge Ma.