Von: Tim Brown [mailto:tbrown@;CENHUD.COM] > is it true that the tsm server can only process one reclacamation > process at any one time > so if 2 storage pools require reclaimation then the 2nd storage > pool will be reclaimed after the > first storage pool is recalimed and not simultaneously
From: ADSM: Dist Stor Manager [mailto:ADSM-L@;VM.MARIST.EDU]On Behalf Of > no this is not correct, 1 process per pool Still not correct. You can run concurrent reclamations on multiple storage pools, and you can also run concurrent reclamations within each storage pool (given enough tape drives). There can sometimes be contention, in that two different processes need the same tape. If this is so, the second reclamation process will wait until the first process is through with the tape volume. -- Mark Stapleton ([EMAIL PROTECTED]) Certified TSM consultant Certified AIX system engineer MCSE