I guess when they tried to fix the summary table problem they broke something else.
Paul D. Seay, Jr. Technical Specialist Naptheon Inc. 757-688-8180 -----Original Message----- From: Gill, Geoffrey L. [mailto:GEOFFREY.L.GILL@;SAIC.COM] Sent: Saturday, October 26, 2002 8:32 PM To: [EMAIL PROTECTED] Subject: TSM 5.1.5.1 After upgrading to 5.1.5.1 on AIX 4.3.3 I've been having a ton of misses and failed reports, not to mention some as In-Progress that are not and completed. Has anyone else seen this phenomenon on their system? Last night I had 15 failed 25 missed and 6 still show In-Progress. On the ones reporting failed I see this error on the client log yet the backup did complete. 10/26/2002 00:07:37 ANS1301E Server detected system error 10/26/2002 00:07:37 --- SCHEDULEREC OBJECT END CLIENT_M-F 10/25/2002 21:00:00 10/26/2002 00:07:37 ANS1512E Scheduled event 'CLIENT_M-F' failed. Return code = 4. On the ones that are missed, they are just missed, but did complete the previous day, and show in the client log the next scheduled backup. So this doesn't make any sense either. The server log shows this on one of the nodes. Looks like it contacted it then just ended up reporting missed. This schedule starts at 9PM and runs for 2 hours. 10/25/02 22:59:59 ANR2561I Schedule prompter contacting CP-ITS-TAX01 (session 6587) to start a scheduled operation. 10/25/02 23:00:00 ANR0406I Session 6588 started for node CP-ITS-TAX01 (WinNT) (Tcp/Ip 139.121.18.204(1089)). 10/25/02 23:00:05 ANR2578W Schedule CLIENT_M-F in domain NT_DOM for node CP-ITS-TAX01 has missed its scheduled start up window. Geoff Gill TSM Administrator NT Systems Support Engineer SAIC E-Mail: <mailto:gillg@;saic.com> [EMAIL PROTECTED] Phone: (858) 826-4062 Pager: (877) 905-7154