From: ADSM: Dist Stor Manager [mailto:ADSM-L@;VM.MARIST.EDU]On Behalf Of
Frost, Dave
> Does anybody else have problems with backups which have the
> resourceutilization option set to greater than one ?
Well, for starters, resourceutilization, if not set, defaults to 2.
Resourceutilization set to 1 forces a client to use only one threaded
connection to the server, which means that data flow and control flow are
forced into one pipe.

Try taking the resourceutilization line out altogether and see what you get.

--
Mark Stapleton ([EMAIL PROTECTED])
Certified TSM consultant
Certified AIX system engineer
MCSE

Reply via email to