Does anyone know what the status of a scheduled event should be if the Pre
or Post command fails with a non zero return code?

On tests with the 4.2.0 and 4.12.12 win32 clients, the scheduled event
completes successfully even if the Prescheduled command fails with a return
code of 1.

I'm wondering if this is working as designed or if the client should show
the event as failing if a pre or post command fails.


Thanks,

Tim Rushforth
City of Winnipeg

Reply via email to