We have a Policy Domain called Novell, with 25 nodes on it with backup retention (25)
and Arcive retention (365). What I want to do, is move 2 nodes off of this and create
a new Policy with these 2 nodes. I am going to have them go directly to off-site
storage, or straight to tape and then off-site.(to free up library) I want to keep the
Historical data if possible. Can I move 2 nodes of the 25 on one Policy to a new
Policy Domain???
Thanks, Mark Hayden
Network Administrator
E-Mail: [EMAIL PROTECTED]