Hello Max,
> do you keep track of objections? I have no idea what that boils done
> to and would like us to finally get it done, because in any case it
> will be better than before.

Yes, we did, and prepared an updated version of the document addressing
those. That revision was submitted but received limited engagement on
the list. Details on how that version addressed the points in-line. At
the moment it 

> – 7.1.2 forced renumbering is exactly the opposite of what the status
> quo is, we may need to water it down even further in terms of proven
> deployment

This is already rather watered down; But that could be enriched even
further to become a bit more soft.

> – Selling off end-sites with physical assets and considerable
> renumbering burden should be addressed somehow, maybe with an
> exception to the sub-assignment policy, temporary transfer or similar

Do you have a good text suggestion for that?

> – End-site is still too messy for some people

The whole end-site discussion has been removed from the proposal in the
revision.

> – Clarify that multiple end-sites for one PI constitute one
> assignment, obvious but there were similar misinterpretations in the
> past

That should still be in there.

> – Clarify the transition for existing holders of multiple PI
> without(!) growing space needs

There are no implications for existing holders if their space needs do
not change.

With best regards,
Tobias

-- 
Univ.Prof. Dr.-Ing. Tobias Fiebig
T +31 616 80 98 99
M [email protected]
-----
To unsubscribe from this mailing list or change your subscription options, 
please visit: 
https://mailman.ripe.net/mailman3/lists/address-policy-wg.ripe.net/
As we have migrated to Mailman 3, you will need to create an account with the 
email matching your subscription before you can change your settings. 
More details at: https://www.ripe.net/membership/mail/mailman-3-migration/

Reply via email to